Someone walks the route with a clipboard, writes the numbers down, and somebody else types them into a spreadsheet. If that's how your meters get read, BasicBMS hands you the spreadsheet. It's called the read sheet: every meter on the route in walk order, last cycle's reading already filled in so an odd number stands out, and an empty column for the new one. Fill it in, upload the same file, look it over, and commit. Nothing is retyped, and nothing goes in until you say so.
Before you start
- Each service point you read has a meter In Service. Points with no meter fitted aren't on the sheet.
- If you walk routes, each point has its Route: and walk order set on the service point. With no meter routes set up, the sheet covers every service point.
- You have the readinguser role to export. Upload & Stage, Commit and Cancel Batch are shown only to users with readingadmin.
Steps
Open Metering → Import Reads. The import is on the left and Export Route Job on the right.
Under Routes, tick the routes you're reading (all / none select them all or clear them). With no routes set up, the screen says "No meter routes are set up — the job covers every service point."
Under Columns, tick the columns you want on the sheet, or click minimum for just the locked ones. Locked columns can't be unticked: "columns are needed to read the meter and import the file back." Your choice is remembered for next time.
Click Export. The button names what you picked, such as Export 2 routes. A CSV file downloads (
route-job-and the date and time). Exports aren't recorded; Import History lists uploads only.Fill in Reading for each meter, in Excel or on a printed copy keyed in later. Leave a meter blank if it couldn't be read. Leave the header row and the other columns as they are, and keep the file as CSV when you save. Excel re-saving the dates as 10/25/2026 is fine.
Back on Import Reads, leave Format: on Auto-detect (recommended). Click Browse, choose the file, and click Upload & Stage. Nothing is written yet.
Review Staged Rows opens with three counts: Rows in file, Will import and Needs attention. Each row has a Resolution, and any row that won't import has its Reason beside it. Use Resolution: to show one kind at a time.
Click Commit N Matched Row(s) (the number is how many will import). Only Matched rows are written. Cancel Batch throws the upload away instead.
Open Metering → Read Exceptions for any reads that failed screening. Every committed read is screened straight away, and the message says how many were flagged.
The read sheet's columns. The header row is the key the import reads, so don't rename it. The label is what the Columns list shows.
| Header | Label | Locked | Filled in by |
|---|---|---|---|
Route | Route | Locked | BasicBMS |
RouteSequence | Walk order | BasicBMS | |
ServicePointNumber | Service point | Locked | BasicBMS |
LocationID | Location ID | BasicBMS | |
CustomerName | Customer | BasicBMS | |
ServiceAddress | Service address | Locked | BasicBMS |
MeterSerial | Meter serial | Locked | BasicBMS: confirms the right meter |
EndpointSerial | Endpoint serial | BasicBMS | |
RegisterNumber | Register | BasicBMS | |
UnitOfMeasure | Unit | BasicBMS | |
AverageUsage | Average usage | BasicBMS: to spot an odd read | |
PeriodStart | Period start | BasicBMS | |
PeriodEnd | Period end | Locked | BasicBMS; the reader may change it |
StartReading | Prior read | BasicBMS: last cycle's closing read | |
EndReading | Reading | Locked | The reader |
ReadDate | Read date | The reader; blank means the period end | |
ReaderInitials | Reader initials | The reader | |
Comment | Comment | The reader |
Each meter's period runs from the day after its last read period through one cycle of its billing schedule, or one month if it has none. A point that has never been read gets the end date most of the route is on. Rows match back to the meter by its serial first, then the endpoint serial, the location ID, and the service point number.
What each resolution means. Matched will import. Unmatched names a service point that doesn't exist yet: create it, then upload the file again. Ambiguous means a serial or number fits more than one meter or point. Duplicate is a meter and cycle already imported, or listed twice in the file. Invalid is a row that can't be placed, usually a meter left blank.
What posts behind it
Nothing. Exporting, staging and committing a read sheet write no journal entry. The usage posts with the bill that carries it, on the recurring run.
When it won’t let you
Not read: no reading was entered, so nothing is imported for this meter. Enter it and upload again, or leave it; the bill run flags a missing read. The meter was left blank on the sheet. Type the reading and upload the file again, or leave it: if no read comes in for the period, the bill run bills fixed charges only and puts a NoRead on Read Exceptions.
A reading for this meter and cycle has already been imported. That row is already in. Upload the same file twice and every row comes back Duplicate, so nothing is entered twice. To fill in a meter you left blank before the bill runs, type it and upload the file again: only the new reading is Matched. After the bill has run, enter it on the NoRead entry on Read Exceptions instead; the upload would come back Duplicate.
No service point matched. Tried meter serial, endpoint serial, location id and service point number. Create the service point first — rows are never auto-created. The import never creates a service point. Add it, then upload again.
No active service points with a meter were found on the selected routes. The routes you ticked have no active point with a meter fitted. Check the points' Route:, or pick another route.
What this doesn't do
It doesn't read the meter for you. AI meter reads, from a photo or a voice note of the dial, aren't built. Imports from other tools aren't built either: the BEACON and Trimble formats are on the Format: list but disabled, and the screen says "Unavailable formats are listed but disabled — hover one for the reason." It doesn't estimate a meter left blank, and it doesn't create service points or meters.
Related
- From meter read to bill — where this fits, from the reading to the printed bill
- What happens when a meter read is missing, and how to fix it — the meters you left blank
- How water usage gets onto a metered customer's bill — what the run does with the reads
- Why meter reads belong to the service point, not the meter
Stuck on this one? Call (509) 955-0770 and we'll walk through it with you.